BS PD IEC TS 62910:2020
Utility-interconnected photovoltaic inverters. Test procedure for under voltage ride-through measurements

Std & Spec
Standard No.
BS PD IEC TS 62910:2020
Release Date
2020
Published By
British Standards Institution (BSI)
Lastest
BS PD IEC TS 62910:2020
Scope
This document provides a test procedure for evaluating the performance of Under Voltage Ride-Through (UVRT) functions in inverters used in utility-interconnected Photovoltaic (PV) systems.

This document is most applicable to large systems where PV inverters are connected to utility high voltage (HV) distribution systems. However, the applicable procedures may also be used for low voltage (LV) installations in locations where evolving UVRT requirements include such installations, e.g. single-phase or 3-phase systems.