BS EN 60071-2:1997
BSI · 1997-04-15

Insulation co-ordination - Application guide

Replaced ICS 29.080.01

1Key Takeaways

This part of IEC 71 constitutes an application guide and deals with the selection of insulation levels of equipment or installations for three-phase electrical systems. Its aim is to give guidance for the determination of the rated withstand voltages for ranges Ⅰ and Ⅱ of IEC 71-1 and to justify the association of thes…

2Scope / Description

This part of IEC 71 constitutes an application guide and deals with the selection of insulation levels of equipment or installations for three-phase electrical systems. Its aim is to give guidance for the determination of the rated withstand voltages for ranges Ⅰ and Ⅱ of IEC 71-1 and to justify the association of these rated values with the standardized highest voltages for equipment.
This association is for insulation co-ordination purposes only. The requirements for human safety are not covered by this application guide.
It covers three-phase systems with nominal voltages above 1 kV. The values derived or proposed herein are generally applicable only to such systems. However, the concepts presented are also valid for two-phase or single-phase systems.
It covers phase-to-earth, phase-to-phase and longitudinal insulation.
This application guide is not intended to deal with routine tests. These are to be specified by the relevant product committees.
The content of this guide strictly follows the flow chart of the insulation co-ordination process presented in figure 1 of IEC 71-1. Clauses 2 to 5 correspond to the squares in this flow chart and give detailed information on the concepts governing the insulation co-ordination process which leads to the establishment of the required withstand levels.
The guide emphasizes the necessity of considering, at the very beginning, all origins, all classes and all types of voltage stresses in service irrespective of the range of highest voltage for equipment. Only at the end of the process, when the selection of the standard withstand voltages takes place, does the principle of covering a particular service voltage stress by a standard withstand voltage apply. Also, at this final step, the guide refers to the correlation made in IEC 71-1 between the standard insulation levels and the highest voltage for equipment.
The annexes contain examples and detailed information which explain or support the concepts described in the main text, and the basic analytical techniques used.

3Version History

90/26440 DC-1990 older
BS 5622 Part 2:1979 older
BS EN IEC 60071-2:2018 newer

5Citation Network

0
Cite this standard
0
Referenced herein

6Frequently Asked Questions

What is BS EN 60071-2:1997?
BS EN 60071-2:1997 — Insulation co-ordination - Application guide is an international standard developed by British Standards Institution (BSI). This part of IEC 71 constitutes an application guide and deals with the selection of insulation levels of equipment or installations for three-phase electrical systems. Its aim is to give guidance for the determination of the rated withstand...
What does BS EN 60071-2:1997 cover?
This standard covers: This part of IEC 71 constitutes an application guide and deals with the selection of insulation levels of equipment or installations for three-phase electrical systems. Its aim is to give guidance for the determination of the rated withstand voltages for ranges Ⅰ and Ⅱ of IEC 71-1 and to justify...
Who should use this standard?
This standard is intended for organizations, professionals, and stakeholders involved in various industries and sectors. It is applicable to manufacturers, service providers, regulatory bodies, and certification organizations.
What is the latest version of BS EN 60071-2:1997?
The current published version is BS EN 60071-2:1997, published on 1997-04-15. Always check for amendments or pending revisions.
How do I purchase BS EN 60071-2:1997?
You can purchase BS EN 60071-2:1997 by visiting our contact page. Click "Get This Standard" to view pricing and send a purchase inquiry. Our team will respond with payment and delivery details.