Code for Quality Inspection and Acceptance of Construction Works of Small-scale Water Conservancy Projects
1Key Takeaways
Standard Name Small Hydropower Engineering Unit Construction Quality Inspection and Acceptance Specification Standard No. DB 13/T 6023-2024 Scope of Application This document specifies the requirements for quality inspection and acceptance during unit construction work in small hydropower eng…
2Expert Interpretation
Professional interpretation of Hebei Province's DB13/T 6023-2024 standard, covering the unit division principles, acceptance indicators and implementation points of 9 types of small-scale water conservancy projects such as river embankments, reservoirs, and water plants, and providing a comparison table of main control project detection methods and qualified standards.
Interpretation of the core content of the standard
| Project type | Unit division principle | Example of main control project | Qualification rate requirement |
|---|---|---|---|
| River excavation | Every 200-500m or by structural section | Bottom elevation (-200~0mm), bottom width (0~+50mm) | 100% qualified |
| Embankment filling | Every 100-500m or 500-2000m³ | Compaction degree, soil thickness (-5~0cm) | ≥85% |
| Concrete pavement | Every 500-1000m | Flexural strength, thickness (-12mm) | 100% qualified |
Key technical requirements
- The compaction degree test of earthwork engineering adopts the ring knife method/sand filling method, and 2 points are measured every 200m
- The deviation of the steel bar protective layer of the concrete structure is ≤±5mm, and 5 points are measured every 20 linear meters
- The sealing surface gap of the cast iron gate is ≤0.1mm, and all are tested
Implementation suggestions
Key points of quality control
- Establish a unit project acceptance ledger to record the version validity of referenced standards such as SL634
- Focus on monitoring process conversion nodes: For example, the embankment foundation must be inspected by four parties after cleaning
- Special parts (such as anti-seepage structures) should increase the frequency of third-party inspections
Treatment of common problems
| Problem phenomenon | Specification basis | Treatment plan |
|---|---|---|
| Poor bonding between filling layers of the embankment body | Article 5.5.2 of SL260 | Shaving treatment of 3-5cm and sprinkling water to moisten |
| Concrete pavement cracks | Article 8.2.3 of SL677 | Epoxy resin grouting + surface sealing |
Standard evolution analysis
Compared with DB13/T 5360-2021, this specification has been mainly upgraded:
- New acceptance requirements for automation control units (Article 8.7)
- Detailed classification standards for farmland water conservancy projects (Chapter 9)
- Supplemented 22 referenced standards (including 8 newly issued standards after 2020)